Data Center PDU OEM: The Definitive Guide to IEC 60320 C13/C19, ATS & Remote Monitoring

TIER IV COMPLIANT SOLUTIONS

Engineering 1.5 million units annually for global IDC infrastructures. From NEOM’s 800-rack clusters to 100W PD integration, Yingwang redefines the power backbone of the AI era.

“The Zero-Downtime Mission”

I am Jiang Du, founder of Cixi Yingwang. In high-density server rooms, a PDU isn’t a socket—it’s a critical logic node. After powering supercomputing centers across 30+ countries, we’ve mastered the ±0.03mm precision required to prevent hotspots in 7×24 high-current IDC loads.

IDC PROJECT DATA:
2,600+ Units
Delivered to Top-Tier Data Centers in 2024

Technical Logic & Selection Map

Power Ratings & Cables

Supporting 16A, 32A, up to 63A 3-Phase. We exclusively use Jintian H62 Pure Copper with OFC oxygen-free conductors in 3×1.5mm² to 3×16mm² tiers.

C13/C19 Hybrid Grid

Standard 24C13 + 4C19 layout. Engineered for mixed hardware environments (IBM, Dell, Cisco, NetApp). Zero-vibration locking sockets available.

Intelligent ATS Switching

Redundant power switching with 4-8ms ultra-fast transition. Dual mains input with diesel-generator priority logic for Tier III/IV uptime.

SNMP & Cloud Monitoring

Full SNMP v2c/v3, Modbus TCP, and RESTful API stacks. Real-time voltage, current, and energy-per-outlet (EPO) tracking with alert integration.

Professional IDC Configuration Matrix

Rack Unit Output Combo Smart Logic Application
Standard 1U 24 × C13 + 4 × C19 Basic Surge Protection General Purpose Server Room
Intelligent 1U 24 × C13 + 4 × C19 SNMP v3 + Monitoring Medium Scale Data Center
High-Density 0U 48 × C13 + 8 × C19 SNMP + ATS (Modular) Cloud & GPU Clusters
Redundant PDU Custom Matrix Dual-ATS + Remote Reboot Mission Critical Tier IV IDC

Global Project Portfolio: 2024 IDC Re-Cap

Middle East NEOM Data Center

800 Racks equipped with Smart PDU + ATS integration. Phase-based delivery across 24 weeks with 36-month Platinum engineering warranty.

Status: OPERATIONAL

SE Asia Financial Cloud

1,200 Racks utilizing SNMP v3 secure monitoring PDU. Customized 3m high-current IEC 60309 power cords included.

Status: OPERATIONAL

Typical OEM Sourcing Cycle (IDC Scale)

W1: Brief & Evaluation
W2: 3D Design & Topology
W4: Proto & DCIM Stress Test
W6-W12: Batch Production & FAT

Data Center PDU Expert FAQ

Q1: How does your SNMP v3 handle network security?

A: Our intelligent PDU firmware supports full encryption via SNMP v3 with AES and DES authentication. We provide secure firmware isolation to ensure the power monitoring network is physically and logically separated from the data traffic.

Q2: What is the real-world lifespan of an ATS switching module?

A: Yingwang ATS modules are designed for a 10-year engineering lifecycle. We use high-end relay contacts tested for ≥100,000 switching operations, well beyond the standard Tier III/IV upgrade cycles.

Q3: Can we customize the PDU housing length for 48U server racks?

A: Yes. As an integrated Guanhaiwei factory, we provide custom aluminum profile extrusions. We can build vertical 0U PDUs up to 2.2 meters to provide 48-outlet density for ultra-large racks.

Power Your Infrastructure with Precision

Partner with the technical leader in Cixi’s industrial hub. From concept to TIER IV deployment.

🚢 IDC Express Logistics ⚡ 63A 3-Phase Ready 🛡️ SNMP v3 Encrypted

发表评论

了解 Yingwang 的更多信息

立即订阅以继续阅读并访问完整档案。

继续阅读